DIY LED Sign Kits Shipped To Pittsburgh, Pennsylvania

Sign Kits Shipped To Pittsburgh

Prepared DIY LED sign cabinet kits, built to your size and shipped to Pittsburgh, Pennsylvania — LEDs mounted inside the frame, power supply included as quoted. No sign-building experience required.

For daily, weekly & monthly deals and coupon codes — please Like & Follow us on Facebook! Like & Follow
Shipped Nationwide · Prepared In Our Shop · Since 2004

Hills, Bridges And Bad Sightlines.

Pittsburgh is a city of neighborhoods with their own main streets, and every one of them — Lawrenceville, the Strip, East Liberty, Bloomfield, the South Side, Squirrel Hill — runs on small independent business. Those blocks are also hard on signage: narrow buildings, older facades, and hills that change every sightline. Our prepared DIY LED sign kits ship anywhere in Allegheny County with the lighting mounted inside the frame.

We weld the aluminum cabinet to the exact size you have been approved for and cut it into sections that travel by parcel. You bolt it together and hang it. Depending on the project, that keeps up to 60% of the cost inside your business instead of a sign company's.

What Ships · What It Saves

The Kit, And The Price Difference

DIY LED lighted sign cabinet kit shipped to Pittsburgh, PA — aluminum frame shown unassembled, then assembled and lit
What arrives in Pittsburgh: an aluminum cabinet cut to your size with the LEDs already mounted inside, packed in sections sized to ship by ground.
Example comparison of a $920 DIY Sign Guy sign kit invoice next to a $3,112.62 competitor invoice for a 4 by 8 foot lighted sign
Example comparison — one 4′×8′ sign, two invoices. Sign faces and graphics are not included; prices subject to change without notice.
Around The Metro

Shipping To Pittsburgh And Every Town Around It

Kits ship to Mount Lebanon, Bethel Park, Monroeville, Ross Township, Wilkinsburg, Carnegie, McKees Rocks and Penn Hills — and everywhere in between. If FedEx delivers there, your sign kit can too.

Sign placement in Pittsburgh is a topography problem before it is anything else. A cabinet that reads perfectly on a flat street disappears from below a hill or hides behind a bridge abutment. Stand where your customers actually approach from — on foot, coming off the parkway, cresting the grade — and size the sign for that view before you order. Then take the number to the city, get it approved in writing, and we weld the cabinet to it.

Every prepared kit includes: an aluminum frame cut to your size with welded corners, LEDs mounted inside, and a 12-volt power supply with wiring hardware as listed in your written quote. Sign faces and graphics are available separately through DIY Graphics.

Rectangular DIY lighted box sign cabinet with LED lighting inside and a printed graphics face, exclusively at DIYsignGuy.com
Shipping & Delivery

How Your Kit Gets To Pittsburgh

Ground shipping suits Pittsburgh for a reason anyone who has tried to get a truck up a South Side alley already understands. Roughly 95% of our kits go FedEx Ground rather than freight, so the boxes arrive on the parcel van that already navigates these streets daily instead of on a trailer that may not physically fit on your block.

What shows up. A standard cabinet is four long boxes. Bigger kits come as six, with splice joints built in so nothing exceeds ground shipping dimensions. The sections are welded to your size with the LEDs mounted inside them, and the power supply and mounting hardware travel in the same boxes as quoted. One delivery, no separate parts crate, nothing missing when you start work.

Delivery day. Older Pittsburgh commercial buildings rarely have a dock, and street parking on a Lawrenceville or Bloomfield block is not something you can hold open for a freight appointment. Ground delivery avoids the whole problem. No liftgate, no pallet, no appointment. One person can carry the boxes up the steps and inside without shutting the business down for an hour.

Open the boxes the day they land. Look the sections over even if the cartons look perfect, and do it before install day rather than the morning of. Photograph anything crushed, torn or bent and keep the packaging exactly as it arrived — that is what a carrier claim is built on. Finding a problem the day a box shows up is a phone call; finding it with a crew standing on a ladder is a lost day.

Where to put it. Aluminum does not rust and it takes western Pennsylvania winters without any special treatment. The LEDs and the power supply should still be kept indoors until install day. Freeze-thaw here is relentless, so if you are mounting during the cold months, plan the install for a dry stretch and let the sections warm up inside before you fit them together.

The exceptions go by truck. A cabinet too long to splice down into shippable sections, a pole or pylon project with structural parts that will not box, or several cabinets ordered at once are all cheaper and safer palletized — and if yours is one of those, it is priced that way in your written quote up front, not added later.
Before You Order

Measure Twice. Order Once.

Your kit is cut to a size, welded, and pre-lit before it ships, so the size has to be right the first time. In Pittsburgh that means three phone calls before you order, not after.

1. Ask what you're allowed

Inside the city, sign permits and zoning review go through Pittsburgh's permits and inspections office, and some neighborhoods add historic review on top of that. Outside city limits you are dealing with your own municipality — Allegheny County contains a great many of them, and Mount Lebanon, Ross and Monroeville each write and enforce their own sign rules. Ask for the maximum sign area and height for your zoning district, whether your sign counts as wall-mounted or freestanding, and what setback applies. Sign area is usually tied to your building frontage, so the answer is specific to your address — not to the block or to the business next door.

2. Ask your landlord

If you're in a plaza or center, the landlord's sign criteria sit on top of the city code and are often stricter. Cabinet depth, face color, letter height and mounting method are all commonly spelled out. Get the criteria sheet in writing before you pick a size — it is cheaper than rebuilding a cabinet that the center won't approve.

3. Ask about engineering and wiring

Pennsylvania's construction code is statewide, but how it gets enforced varies by municipality, so ask locally rather than assuming. A pole or freestanding sign commonly needs sealed drawings and a footing design from a Pennsylvania-licensed engineer, and hillside footings can complicate that further. An illuminated sign generally requires an electrical permit separate from the sign permit. Plan on a licensed electrician for the final hookup and inspection either way. We build the cabinet; the permit, the footing, the disconnect and the sign-off are local work done by local people.

Once you have your approved number, send it over and we cut to it exactly. Nothing here is legal or engineering advice — requirements change by jurisdiction and by site, so confirm yours with the City of Pittsburgh or your own municipality, your landlord, and a licensed electrician before ordering.
Pittsburgh Questions

Straight Answers For Pittsburgh Businesses

Can I mount a cabinet on an old brick facade?

Usually, but the fastening is the part to think through. Older Pittsburgh brick and the mortar behind it vary a lot in condition, and the right anchors depend on what is actually there. We supply mounting hardware with the kit as quoted; if the wall looks questionable, have somebody who works on these buildings take a look before you drill.

Is a double-sided cabinet worth it here?

Depends on the approach. On a one-way street, or a corner where traffic only comes from one direction, single-sided is fine and it costs less. Where people come at you from both ends of the block, double-sided doubles the number of people who ever see it. The same frame supports either, so tell us which when you request the quote.

What is involved in getting a sign permit in Pittsburgh?

Assume a permit, and assume it takes some time. Sign applications generally go through the city's permits and inspections office with zoning review attached, and a historic district address can add a design review step. Illuminated signs commonly need an electrical permit too. Get the approved dimensions in writing before you order, because the cabinet is welded to that size.

Who should do the electrical hookup?

A licensed electrician handles the connection. These kits are not UL listed, so that is not a corner worth cutting, and in Pennsylvania the work is inspected. You do the assembly and the mounting, which is the part that would have cost you the most in labor. Get an electrician's number lined up before the kit shows up rather than after.

We're a nationwide shop — not a local Pittsburgh sign company — and that's exactly why the price works. DIY kits are not UL listed; please check with your local township and follow all sign, zoning, electrical, inspection and installation guidelines before ordering.

Ready to get your written quote?

Every kit is prepared to order. Tell us about your project and we'll answer with a straight, written quote.

Contact DIY Sign Guy